Basement Walls And Ceiling

 

At the end of this phase there will be a fairly waterproof basement.  There will be holes in the ceiling (ie main level floor) where the stairs will eventually go up and for the elevator (and view hole), but tarp covered wooden covers can be put over the holes.  The basement windows will have been fitted.  If wanted you could even live in the basement (unofficially).

The portico bases (safe room and south porch) are included in the basement phase.

There will be clean ICF Lego tops three feet above floor level with 30 inches of corrosion-proof rebar sticking up above that.  There will be 3.5" keyway notches in the top of the concrete of the wall formed using polyethylene wrapped 2x4s.

     Star Carnation Walling (ICF)

     Star Carnation Flooring

     Star Decking and Porticos

     Star Access Holes

     Star Concrete Pour

     Star Concrete Set Time

     Star Batons Doors Windows

     Star Making Good

 