Header
Carnation Construction
Contact Dave
Carnation
S-08-00 Page loading indicator

Home Site Map - Steps -

Roof and Attic

 

At the end of this phase the house will look like a finished house including the metal clad roof.  The cupola will not have been done and the hole to come up through the Cupola floor will have been temporarily covered over with a weatherproof hatch.  The hatch will be operable so that we can get up onto the roof using an internal ladder.  Prior to the start of this phase, the gable walls will already be in place.  They are done with the bedroom level walls.

     Star Roof Framing

     Star Water Piping Membrane

     Star Flat Roofing Vents Drip Edges

     Star Metal Roofing

     Star Walkway Railings Gutters Finishing

 

Roof vent hole at north top